- Sort:
- Most Popular | Most Recent
-
The Linn Cove Viaduct is a 1243-foot concrete segmental bridge which snakes around the slopes of Grandfather Mountain in North Carolina. It was completed in 1983 at a cost of $10 million and was the last section of the Blue Ridge Parkway to be finished. It is said to be the most complicated concrete bridge ever built. ...
-
Stats
- Favorites
- 0
- Comments
- 0
- Snapshots
- 0
- Total Views
- 856
- Explore Score
- 1
-
The Linn Cove Viaduct is a 1243-foot concrete segmental bridge which snakes around the slopes of Grandfather Mountain in North Carolina. It was completed in 1983 at a cost of $10 million and was the last section of the Blue Ridge Parkway to be finished. It is said to be the most complicated concrete bridge ever bu...
-
-
Stats
- Favorites
- 0
- Comments
- 0
- Snapshots
- 2
- Total Views
- 1145
- Explore Score
- 1
-

