- SR-826/SR-836 Interchange Project Showing Partial Completion of Bridge #12 and Bridge #15 at Noon of October 16, 2012 by Robert Holmes
-
This Gigapan shows the partial completion of Bridge #12 and Bridge #15 at Noon of October 16, 2012. This picture was shot from atop the new Bridge #11. Equipment: This gigapan was photographed with a Nikon D-800 Camera using a Nikon 28-300mm lens set to 300mm, mounted on a Gigapan Epic-Pro. My settings were F:16, S...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 88
- Explore Score
- 1
- SR-826/SR-836 Interchange Looking at EB 836 & SB 826 from atop new Bridge #11 at Noon on 10/16/2012 by Robert Holmes
-
SR-826/SR-836 Interchange Looking at EB 836 & SB 826 from atop new Bridge #11 at Noon on 10/16/2012 Equipment: This gigapan was photographed with a Nikon D-800 Camera using a Nikon 28-300mm lens set to 300mm, mounted on a Gigapan Epic-Pro. My settings were F:16, Shutter @ 1/250 sec. & ISO 200
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 140
- Explore Score
- 1
- Bridge 11 of the SR-826/SR-836 Interchange Project, being assembled with a Launching Gantry (affectionately called "Smooth Operator") by Robert Holmes
-
This is Bridge #11 of the SR-826/SR-836 Interchange Miami-Dade County Project, being assembled with a Launching Gantry (affectionately called "Smooth Operator") as it approaches the end of it's span. This Bridge will provide a path for East Bound SR-836 traffic to turn onto Northbound SR-826. Once the assembly of the...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 118
- Explore Score
- 1
- SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from East at 105mm by Robert Holmes
-
SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from East at 105mm. This bridge will allow traffic to move from SR-836 West to SR-826 South. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a result of ...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 127
- Explore Score
- 1
- SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from the East by Robert Holmes
-
SR-826/SR-836 Bridge 15 with 12 Segments Up & 12 Segments Down as viewed from the East. This view was shot with a 300mm lens on a Nikon D800 (36Mp) Camera. This bridge will allow traffic to move from SR-836 West to SR-826 South. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridg...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 116
- Explore Score
- 1
- SR-826/SR-836 Interchange Bridge 15 with 12 Segments UP & 12 Segments Down as viewed from the West by Robert Holmes
-
SR-826/SR-836 Interchange Bridge 15 with 12 Segments UP & 12 Segments Down as viewed from the West. This bridge will allow traffic to move from SR-836 West to SR-826 South. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a res...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 119
- Explore Score
- 1
- SR-826/SR-836 Interchange Bridge 15 in Early Stage with 8 Segments Up & Down, LI240001-0054_2A by Robert Holmes
-
SR-826/SR-836 Interchange Bridge 15 in Early Stage with 8 Segments Up & Down. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a result of assembly with cranes it is necessary to shut down all traffic during assembly. To minimi...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 83
- Explore Score
- 1
- Launching Gantry (Smooth Operator) Erecting Bridge #11 in the SR-826/SR-836 Interchange Miami-Dade County Project_LF030678-0821_E by Robert Holmes
-
Francis P. Chin P.E., Senior Project Engineer for AIM Engineering in Miami, Florida, points out the Launching Gantry being used to erect the Segmental Bridges for the SR-826/SR-836 Interchange in Miami-Dade County, Florida
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 144
- Explore Score
- 1
- SR-826/SR-836 Bridge 15 Under Construction with 5 Segments Up & 5 Segments Down, LI190001-0048 taken Sept 19, 2012 by Robert Holmes
-
SR-826/SR-836 Bridge 15 Under Construction with 5 Segments Up & 5 Segments Down_LI190001-0048 taken Sept 19, 2012
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 166
- Explore Score
- 1
- SR-826/SR-836 Interchange Project, LI190052-0326, 360 degree Panorama taken Sept 19, 2012 by Robert Holmes
-
SR-826/SR-836 Interchange Project, File: LI190052-0326), 360 degree Panorama taken Sept 19, 2012 from atop the new Bridge 11. This Bridge 11 was constructed with the Launching Gantry, affectionately called the "Smooth Operator". The last segment of this Bridge #11 was installed at the end of August. Then begins the ...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 244
- Explore Score
- 1