- Sort:
- Most Popular | Most Recent
- President Obama's visit to The Port of Miami. This picture was taken just as President Obama was leaving the Port of Miami after his inspection of the New Tunnel Project connecting the Port & MacArthur Causeway. by Robert Holmes
-
This picture was taken just as President Obama was leaving the Port Of Miami after his inspection of the New Tunnel Project. This is the view of Miami, Bayfront Park, The Port of Miami, the Causeways and Miami Beach as seen from the Vizcayne Condo North Tower. In the foreground is Bayfront Park. You see the remains of...
-
-
Stats
- Favorites
- 2
- Comments
- 5
- Snapshots
- Total Views
- 2162
- Explore Score
- 112
-
-
SR-826/SR-836 Interchange Bridge 19 in progress on April 16, 2013 - a wider view (Image # MD160984-1037_A.TIF)
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 87
- Explore Score
- 46
-
This is Bridge 19 on Pier 8 with 8 Segments Up and 8 Down as it progresses toward Pier 7, still under construction. This Bridge is part of Florida's SR826/SR836 Interchange Project. There will be four of these Segmental Bridges that will provide overhead Left Turn access from all four directions of the interchange. ...
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 81
- Explore Score
- 40
-
-
This is Bridge 19 of the SR826-SR836 Interchange Project. Bridge 19 will provide Southbound SR826 access to Eastbound SR836. This Bridge is now ready to pour the Closure Joint between the Cantilever Sections on Pier 9 and Pier 8. You will notice that Segment 8-12D has not yet been installed but is positioned at the...
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 68
- Explore Score
- 39
-
- Bridge 19 on Pier 8 with 8 Segments Up and 8 Down as it progresses toward Pier 7 in progress by Robert Holmes
-
This is Bridge 19 on Pier 8 with 8 Segments Up and 8 Down from a different prospective, still under construction. This Bridge is part of Florida's SR826/SR836 Interchange Project. There will be four of these Segmental Bridges that will provide overhead Left Turn access from all four directions of the interchange. Bridg...
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 46
- Explore Score
- 38
-
- Biscayne Bay Highrises and Venetian Causeway in Miami as seen from the Venetian Isle Condo - A Wider View by Robert Holmes
-
Biscayne Bay Highrises and Venetian Causeway in Miami as seen from the Venetian Isle Condo - A Wider View. (Image MD271081-1254_A.PSB) This Gigapan was shot with a Nikon D-800 Camera and a Nikon 28-300mm lens set at 300mm.
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 380
- Explore Score
- 37
-
-
Viera Wetlands. About these wetlands… This constructed wetland system consists of four shallow marshes and a deep central lake, each component surrounded by earthen berms. Constructed in 1998, the entire site totals about 200 acres. In addition to polishing reclaimed discharge water from the adjacent wreatment fa...
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 120
- Explore Score
- 37
- Miami's Bayfront Park, Bayside and Port of Miami as seen from the Vizcayne Condo South Tower by Robert Holmes
-
Miami's Bayfront Park, Bayside and Port of Miami as seen from the Vizcayne Condo South Tower. (Image MD240001-0330-2_A.PSB
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 367
- Explore Score
- 36
-
- Biscayne Bay Highrises and Venetian Causeway in Miami as seen from the Venetian Isle Condo by Robert Holmes
-
Biscayne Bay Highrises and Venetian Causeway in Miami as seen from the Venetian Isle Condo. (Image MD271435-1805_A.PSB) This image shot with a Nikon D800 Camera and a Nikon 300mm F4 lens with a 1.7 teleconverter giving an equivalent focal length of 510mm.
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 243
- Explore Score
- 36
-
-
This is Pier 8 of Bridge #19 with the Launching Gantry's Front Support on top of Pier Segment 8-0 with P-1-U & P-1-D erected on either side. This Bridge #19 is a part of Florida's SR-826 / SR-836 Interchange Project in Miami. This Bridge will connect southbound SR-826 to eastbound SR-836. (Image ME270001-0056_B.psb)
-
-
Stats
- Favorites
- 0
- Comments
- Snapshots
- Total Views
- 68
- Explore Score
- 34
-

