Log In now to add this GigaPan to a group gallery.
Log In now to add this GigaPan to a gallery.
About This GigaPan
Toggle- Taken by
-
Dave Belcher
- Explore score
- 1
- Size
- 0.28 Gigapixels
- Views
- 1648
- Date added
- June 28, 2010
- Date taken
- June 26, 2010
- Categories
- Galleries
- Competitions
- Tags
- dragline, coal, mine, keephills, power, shovel, edmonton, transalta, utilities
- Description
-
The Keephills mine has a new shovel for digging off the overburden from the coal seams west of Edmonton. It took more than a year to construct and weighs 8000 tons with a boom of 425 feet and a bucket of 160 cubic meters.
Stitcher Notes
ToggleMinimizeGigaPan Stitcher version 0.4.3865 (Macintosh)
Panorama size: 278 megapixels (28026 x 9948 pixels)
Input images: 50 (10 columns by 5 rows)
Field of view: 30.6 degrees wide by 10.9 degrees high (top=8.2, bottom=-2.7)
Settings:
All default settings
Original image properties:
Camera make: Panasonic
Camera model: DMC-FZ50
Image size: 3648x2736 (10.0 megapixels)
Capture time: 2010-06-26 19:52:00 - 2010-06-26 19:54:29
Aperture: f/5.6
Exposure time: 0.003125
ISO: 100
Focal length (35mm equiv.): 310.0 mm
Digital zoom: off
White balance: Fixed
Exposure mode: Automatic
Horizontal overlap: 25.3 to 28.2 percent
Vertical overlap: 30.2 to 49.8 percent
Computer stats: 2048 MB RAM, 2 CPUs
Total time 51:38 (1:01 per picture)
Alignment: 3:56, Projection: 8:32, Blending: 39:09

fetching snapshots...
GigaPan Comments (0)
Toggle Minimize gigapan_comment