1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


Florida's SR826-SR836 Interchange Project showing Bridge 11 and Bridges 9 & 19 in progress as seen from Bridge 15 over SR836E by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Robert Holmes Robert Holmes
Explore score
32
Size
2.13 Gigapixels
Views
204
Date added
Jun 13, 2014
Date taken
Jun 13, 2014
Categories
 
Galleries
Competitions
Tags
Description

Florida's SR826-SR836 Interchange Project showing Bridge 11 and Bridges 9 & 19 in progress as seen from Bridge 15 over SR836E. (Image NF130001-0154_AL.psb) This image shows the heart of the Interchange. Southbound SR826 has just been switched to the new SR826 Southbound lanes, opening up the old lanes for construction equipment to remove the remaining section of the old SR836 westbound bridge and to erect Pier 8 for Bridge 9 which is located right in between the old North and south bound lanes. You see at the bottom of the picture, a backhoe is digging the hole for the foundation of Pier 8 and the tall red crane that will drive the 36 each 55 foot piles for the base of Pier 8.


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle
Sorry, this gigapan has no location information.

Member Log In