Bridge 19 Ready to pour the Closure Joint between Pier 9 and Pier 8 by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Robert Holmes Robert Holmes
Explore score
1
Size
0.59 Gigapixels
Views
372
Date added
Jun 09, 2013
Date taken
Jun 09, 2013
Categories
 
Galleries
Competitions
Tags
Description

This is Bridge 19 of the SR826-SR836 Interchange Project. The camera angle makes the Gantry appear to be curved, when in fact it is perfectly straight and level. This Bridge will provide Southbound SR826 traffic access to the Eastbound lanes of SR836.

This Bridge is now ready to pour the Closure Joint between the Cantilever Sections on Pier 9 and Pier 8. You will notice that Segment 8-12D has not yet been installed but is positioned at the end of the bridge as a counterweight. Segment 8-12D will not be installed until the Closure Joint is complete. The Gantry's Front Support is positioned right over Pier 8 and the Rear Support has been moved to right over Pier 9 to remove any stress on the Closure Joint. If you look carefully you will see that the Closure Joint has been formed and there are two large & long steel beams over the Closure Joint, spanning & bolted to three segments in either direction to hold the two bridge cantilevers in perfect alignment, while the Closure Joint is poured & cured. To the right you will see Pier 7, still under construction, being made ready for the continuation of Bridge 19. The Launch of Bridge 19 to Pier 7 is expected on or about June 19th.

(Image MF090458-0493_A.TIF)


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Member Log In