- SR-826/SR-836 Interchange Project
- Competitions
- Tags
- Segmental Bridge, Miami-Dade County, SR-826/SR-836, miami, digitalbob
- Description
-
SR-826/SR-836 Interchange Bridge 15 in Early Stage with 8 Segments Up & Down. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a result of assembly with cranes it is necessary to shut down all traffic during assembly. To minimize the impact on traffic, SR-826 is shut down between the hours of 11:00 P.M. and 5:00 A.M. and the only assembly of this bridge is accomplished during that 6 hour period, in the dark of night. Even with this handicap this bridge is moving ahead of schedule.
This gigapan was photographed with a Nikon D-800 Camera using a Nikon 28-300mm lens set to 300mm, mounted on a Gigapan Epic-Pro. My normal settings for a bright sunny day are F:16, Shutter @ 1/250 sec. & ISO 200 but since today was overcast I reduced the shutter speed to 1/100 sec.