1. Skip to navigation
  2. Skip to content
  3. Skip to sidebar


SR-826/SR-836 Interchange Bridge 15 in Early Stage with 8 Segments Up & Down, LI240001-0128_A by Robert Holmes

Want to add this gigapan to your favorites? Log In or Sign Up now.

Log In now to add this Gigapan to a group gallery.

About This Gigapan

Toggle
Taken by
Robert Holmes Robert Holmes
Explore score
1
Size
1.19 Gigapixels
Views
260
Date added
Sep 24, 2012
Date taken
Sep 24, 2012
Categories
 
Galleries
Competitions
Tags
Description

SR-826/SR-836 Interchange Bridge 15 in Early Stage with 8 Segments Up & Down. This bridge is being assembled with cranes instead of the Launching Gantry used for Bridge 11 because of a tighter radius in Bridge 15. As a result of assembly with cranes it is necessary to shut down all traffic during assembly. To minimize the impact on traffic, SR-826 is shut down between the hours of 11:00 P.M. and 5:00 A.M. and the only assembly of this bridge is accomplished during that 6 hour period, in the dark of night. Even with this handicap this bridge is moving ahead of schedule.

This gigapan was photographed with a Nikon D-800 Camera using a Nikon 28-300mm lens set to 300mm, mounted on a Gigapan Epic-Pro. My normal settings for a bright sunny day are F:16, Shutter @ 1/250 sec. & ISO 200 but since today was overcast I reduced the shutter speed to 1/100 sec. (Image LI290001-0128_A.PSB)


Gigapan Comments (0)

Toggle Minimize gigapan_comment
The GigaPan EPIC Series, Purchase an GigaPan EPIC model and receive GigaPan Stitch complimentary

Where in the World is this GigaPan?

Toggle

Member Log In