Log In now to add this GigaPan to a group gallery.
Log In now to add this GigaPan to a gallery.
About This GigaPan
Toggle- Taken by
-
Robert Holmes
- Explore score
- 1
- Size
- 2.51 Gigapixels
- Views
- 227
- Date added
- July 22, 2012
- Date taken
- July 21, 2012
- Categories
- Galleries
- SR-826/SR-836 Interchange Project
- Competitions
- Tags
- Smooth Operator, miami, digitalbob, Miami Florida, Segmental Bridge, SR-826/SR-836, florida
- Description
-
Here the Smooth Operator has installed the final piece of the Bridge known as B-11 of the SR-826/SR-836 Interchange project in Miami, Florida. This unique piece of equipment, affectionately known as SMOOTH OPERATOR (Technically a Launching Gantry) is providing for the assembly of this massive Interchange with 4 flyover bridges covering all four directions with minimal interference to the flow of normal/heavy traffic. The complete bridge assembly is done overhead, WITHOUT the use of cranes to lift the pieces. This is truly a magnificent piece of equipment. It is said that the use of this equipment will cut the overall project construction time by three (3) years.
To see additional gigapans of this fascinating project search on SR-826/SR-836

fetching snapshots...
GigaPan Comments ()
Toggle Minimize gigapan_comment